Welcome to the MISOSAM development page
General
- MeetingsSummaries - Summaries of meetings and discussions
- StatusReport - Short status report of the activities of 2008
- StatusReportTwo - Short status report of the activities of 2009
- ScientificReport - Final report of the project activities
MoVeTracker
MoVeTracker and M4 pages have been moved to https://svn.nfit.au.dk/trac/rk.
Maize Harvest 2009 (Experiment 3)
- VehicleTracesDesign - Technical details on the vehicle traces feature
- StartBroker - How to start a broker
- StartTracesCoordinator - How to start a traces coordinator
- TestPlanTraces - Tests of trace coordination
Grass Harvest 2009 (Experiment 2)
- ProjectPlanTwo - Project plan for the second experiment at Foulum
- TestPlanTwo - Tests that should be completed before delivering the hardware
- EquipmentList - Things to bring and to have at hand
- ExperimentReportTwo - Technical report of the second experiment
Maize Harvest 2008 (Experiment 1)
- ProjectPlan - Project plan for development of application for Foulum
- ExperimentSetting - Description of the Foulum experiment in September 2008
- ExperimentReport - Technical report of the Foulum experiment
- RaphaelsThesis - Raphael's thesis report on combining REDS and JXTA
Old
- TestProcedure - Proposal for tests to stabilize the REDS platform for the demo in April 2008
- WindowsNetworkSetup - How to set up Windows properly for ad-hoc wireless networking
- FillLevelEstimation - Proposal for paper about the fill level estimation algorithm
Downloads
- http://www.daimi.au.dk/~misosam/harvestdemo.zip - Complete application with simulation files
- http://www.daimi.au.dk/~misosam/media.zip - Movie, images and slides from experiment 2
